| Location: |
Spain |
|
| Interested
Party: |
institutional
wind energy investor |
|
| Required wind
turbines: |
The interested
party is looking for a wind farm consisting of ENERCON or Vestas wind
power plants and a total nominal power of at least 20 MW. The investor is interested in both a turn-key wind farm acquisition
or an acquisition of
the project rights for a wind farm. |
|
Required wind
energy output p.a.
or average wind speed: |
The wind speed at
hub height should not be lower than 6,5 m/s. |
|
| Development
requirements: |
The permission
for grid connection should be available. The developer must guarantee that
the building permission is available by the beginning of 2007 at the
latest. The start of operation should be performed till the end of 2007.
|
|
| Requirements
regarding PPA: |
not specified |
|
| Maximum
Purchase Price: |
to be negotiated |
|
| Brokerīs Commission: |
on request |
|
|
Back to the
overview |
Submit
a project offer |