| Location: |
Germany |
|
| Seller: |
German Wind farm
developer |
|
| Planned wind
turbines: |
6x GE Wind Energy
wind turbines with a nominal power of 2.3 MW and a hub height of 93m. The
total nominal power of the wind farm is 13.8 MW. |
|
| Wind Energy
Output: |
Referring to the
mean of two wind assessment studies the net output of the wind farm will
be 31,845,513 kWh p.a. after reductions of 10% for availability, grid
losses and security. |
|
| Development
Stage: |
The
building permission for four wind turbines are available. The start of
operation is scheduled for the first quater of 2007. |
|
| PPA: |
Referring to the
German Renewable Energy Sources Act (EEG) the remuneration will be 0.0819 EURO/kWh
for a duration of 20 years. |
|
| Operation
Expenses: |
Lease: 5.5
% of the net outputs p.a. till the 12th year of operation. After that the
lease will be 7.5% of the net outputs p.a..
Expenses for Management, Grid Connection,
insurance etc. will be provided on inquiry. |
|
| Finance: |
There was no
inquiry for a loan so far. |
|
| Total
investment: |
The total
investment for the turn-key wind farm is 19,700,000.00 EURO plus German
VAT. |
|
| Brokerīs
Commission: |
1.5% of the total
net investment plus German VAT |
|
|
Back to the overview |
Investment
Inquiry |