| Location: |
Germany |
|
| Seller: |
German Wind Farm
Developer |
|
| Planned Wind
Turbines: |
5x GE Wind Energy
1,5 sl wind turbines with a nominal power of 1.5 MW and a hub height of
93m. The total nominal power of the wind farm is 7.5 MW. |
|
| Wind Energy
Output: |
Referring to the mean of two wind
assessment studies the net output of the wind farm will be 15,655,5217 kWh
p.a. after reductions of 10% for availability, grid losses and security.
|
|
| Development
Stage: |
The
building permission for all wind turbines are available. The start of
operation is scheduled for the end of 2006 or the beginning of 2007. |
|
| PPA: |
Referring to the
German Renewable Energy Sources Act (EEG) the remuneration will be 0.0819 EURO/kWh
for a duration of 20 years. |
|
| Operation
Expenses: |
Lease: 4.5
% of the net outputs p.a. till the 12th year of operation. After that the
lease will be 5.5% of the net outputs p.a..
Expenses for Management, Grid Connection,
insurance etc. will be provided on inquiry. |
|
| Finance: |
A loan commitment
of a German bank for 75% of the total investment is available. |
|
| Total
investment: |
The total investment for the turn-key wind farm is 9,800,000.00 EURO plus
German VAT. |
|
| Brokerīs
Commission: |
1.8% of the total
net investment plus German VAT. |
|
|
Back to the overview |
Investment
Inquiry |